105e0b00
chore(beads): track the spec.sr.ht issue backlog
Seven issues under the epic: Phases 3-5 (write plane -> review UI -> deferred pile, chained by blocks), the loose-ends bucket of latent bugs, and two ops tasks (nav restart, stale apk pins). Exported to a git-tracked JSONL so the backlog is durable and portable, not only in the local embedded Dolt DB.
bigbes <bigbes@gmail.com> — 2026-07-23 04:11:16 UTC
Commit 105e0b003b482928921d6894dfcf6d73ed776d73 —
view raw patch
Parent(s):
b87d2866
| File | Status | + | − |
|---|---|---|---|
.beads/config.yaml
|
M | +3 | -1 |
.beads/issues.jsonl
|
A | +7 |